- Member ID
- #864
- Messages
- 4,567
- Likes
- 861
A 1/4 shank 6-7" long 3/8 head dia double cut bit and a cheap harbor freight 1/4 120volt die grinder.
It would take about 35 hours with a dremel, lol. Might even require 2 dremels, lol.
Turbine inlet
Manifold exit
Ports matched and polished
Wastegate hole ported, radius'd, and polished
More than a "small amount" taken out.
You don't have to take it to the level I do... I'm just saying if your paying me to do it, its a fair deal at $350. But that doesn't mean you have to take it as far as I do. Matching the ports/inlets/outlets is prob the most important and if your leaving it rough and just trying to make it match, you could prob get 80-85% of the results with far less time doing it yourself.
It would take about 35 hours with a dremel, lol. Might even require 2 dremels, lol.
Turbine inlet
Manifold exit
Ports matched and polished
Wastegate hole ported, radius'd, and polished
More than a "small amount" taken out.
You don't have to take it to the level I do... I'm just saying if your paying me to do it, its a fair deal at $350. But that doesn't mean you have to take it as far as I do. Matching the ports/inlets/outlets is prob the most important and if your leaving it rough and just trying to make it match, you could prob get 80-85% of the results with far less time doing it yourself.